



Tile & Stone Removal in Maryland, DC & Northern Virginia
Full tile, stone, mortar-bed, and thinset removal with dust containment, substrate prep, and same-day debris haul-away.
Tile out, thinset ground off, substrate straightedged and reported on — so the floor that goes down next installs against a surface that is actually ready for it.
You Are Not Removing Tile — You Are Removing Four Layers
Removing tile is heavier, dustier, and slower than any other flooring demolition, and how it is done determines what the next floor costs. We break out ceramic, porcelain, marble, travertine, slate, and terrazzo — along with the backer board, mortar bed, or cured thinset underneath — using dust containment and HEPA extraction, then grind the substrate flat so the replacement floor can be installed without a leveling surprise. Serving homes, condos, and commercial buildings throughout Maryland, Washington DC, and Northern Virginia.
Every tile floor is an assembly. Above the subfloor sits a mortar bed, then a backer board or uncoupling membrane, then thinset, then the tile itself — each layer bonded to the one below it. Breaking the tile is the fast part. Getting the bonded layers off without wrecking the subfloor is the job you are actually paying for.
This is why tear-out quotes vary so widely for the same room. A low bid usually means the tile leaves and the thinset stays, and you find out when your next installer quotes a leveling scope nobody warned you about.
We remove the whole assembly, grind the substrate flat, and hand you a written report on what is underneath — whether the replacement is new tile and stone, luxury vinyl plank, or hardwood.
What Is Under Your Tile Changes Everything
Three assemblies cover almost every floor we remove in the DMV, and they price very differently. We identify which one you have by lifting a tile at a threshold or in a closet before we quote — never from a photograph.
Mud-set beds turn up constantly in Washington DC rowhouses and pre-1970s Maryland bathrooms. Slab-bonded tile dominates condos and below-grade rooms. Backer board over plywood is the standard in anything built or renovated since roughly 1990.
Tile & Stone Removal Services We Provide
Floors, walls, showers, stairs, and commercial space — each scoped separately because each removes differently.
Floor Tile & Stone Tear-Out
Ceramic, porcelain, marble, travertine, slate, and terrazzo lifted from kitchens, baths, entries, and open living space — along with the thinset and backer board beneath it.
- Whole floor or single room
- Thinset removed, not left behind
- Substrate swept and inspected
Mud-Set Mortar Bed Removal
Traditional tile set in a thick mortar bed over wire lath, common in DC and Maryland bathrooms built before the 1970s. This is heavy demolition priced by weight and access, not by square foot alone.
- Wire lath and full bed removed
- Weight-rated debris handling
- Framing checked once exposed
Thinset Grinding & Substrate Prep
On concrete, the tile comes up easily and the cured thinset does not. We grind the slab back to a flat, bondable surface so the next floor meets its own flatness requirement.
- Ridge and adhesive removal
- Flatness checked with a straightedge
- Ready for tile, LVP, or hardwood
Wall Tile, Showers & Tub Surrounds
Shower walls, tub surrounds, backsplashes, and wainscot. Wet-area demolition exposes whatever waterproofing was or was not installed, which is the most useful thing a tear-out ever tells you.
- Pan and membrane assessment
- Cement board and mastic removed
- Rot and mold documented
Stairs, Landings & Thresholds
Tiled stair treads, risers, landings, and stone thresholds come out by hand to protect the nosing and framing underneath. Priced per element rather than per square foot.
- Hand demolition on treads
- Marble saddles salvaged where possible
- Nosing condition report
Commercial & Occupied-Building Demolition
Lobbies, restrooms, retail floors, and restaurant kitchens phased after hours or over a weekend, with negative-air containment so the rest of the building stays open.
- After-hours and weekend phasing
- Negative-air dust containment
- COI and elevator coordination
Tile Removal Cost in the DMV
These are the ranges we work from across Maryland, Washington DC, and Northern Virginia. Where your project lands depends on the assembly under the tile, the debris weight, access and parking, and whether the building has rules about when demolition can happen.
| Scope of Work | Estimated Price* | What It Covers |
|---|---|---|
| Ceramic / porcelain floor tile over backer board | $2.50 – $5per sq ft | Tile, thinset, and backer board removed; debris hauled away |
| Tile bonded directly to a concrete slab | $3 – $6per sq ft | Includes grinding cured thinset back to a bondable surface |
| Mud-set mortar bed (pre-1970s bathrooms) | $5 – $9per sq ft | Full bed and wire lath; weight drives disposal cost |
| Natural stone — marble, travertine, slate | $4 – $8per sq ft | Heavier and more brittle; salvage attempts priced separately |
| Wall tile, shower surrounds, and backsplash | $3.50 – $7per sq ft | Includes cement board removal and waterproofing assessment |
| Removal bundled with new flooring from 2020 Flooring | $1.50 – $3.50per sq ft | Reduced rate — crew, truck, and substrate prep already scheduled |
| Dust containment & negative-air setup | $250 – $750per zone | Zip walls, HEPA air scrubber, floor and elevator protection |
| Heavy-debris disposal | $400 – $900per load | Tile and mortar exceed standard dumpster weight limits |
| Minimum service charge | $550 – $850flat | Applies to jobs under roughly 150 sq ft |
* All prices shown are estimates only. Final pricing depends on an on-site inspection. The assembly under the tile, debris weight and haul distance, stair carries, elevator restrictions, containment requirements, after-hours scheduling, and any suspect pre-1980 material all affect the number. We do not quote tile removal from photographs, and the written estimate you sign after the inspection is the price you pay.
What That Looks Like on a Real Job
Hall Bathroom
$550 – $900*
A 60 sq ft floor plus a tub surround in a Rockville or Falls Church colonial. Hits the minimum service charge; doubles if it turns out to be mud-set.
Kitchen & Entry
$1,200 – $2,400*
About 400 sq ft of porcelain over backer board, thinset removed, new underlayment priced separately if the plywood delaminates.
Condo Main Level
$3,000 – $5,500*
800 sq ft bonded to a slab, thinset ground flat, elevator protection and containment included, two heavy-debris loads.
* Illustrative estimates based on typical DMV projects. Planning the replacement floor at the same time? Run the numbers with our flooring waste calculator and luxury vinyl cost calculator.
Our Tile Removal Process
Five steps, the same on every job, from a single bathroom in Gaithersburg to a whole-floor demolition in an Arlington high-rise.
Identify the Assembly Before Quoting
We lift a tile at a threshold or in a closet to see exactly what is under it — backer board, slab, or a mortar bed — because those three cost very different amounts to remove. On pre-1980 homes we also look for vinyl-asbestos tile or black cutback adhesive beneath, and stop if we find it.
Containment, Protection & Building Logistics
Zip walls seal the work zone, a HEPA air scrubber runs under negative pressure, and the path to the truck is protected end to end. In condo and office buildings we file the certificate of insurance, reserve the service elevator, and schedule inside the hours management allows.
Demolition in Controlled Sections
Tile comes up in sections rather than all at once, so debris is bagged and carried out as we go instead of piling up. Wet methods and HEPA extraction keep respirable silica down, which matters as much in an occupied home as it does on a commercial site.
Thinset, Mortar & Underlayment Removal
The layer most tear-out quotes ignore. Cured thinset is ground off concrete, backer board and its screws come off plywood, and mortar beds and wire lath are cut out and removed. This is what makes the next floor installable.
Substrate Report, Flatness Check & Haul-Away
We straightedge the exposed substrate, note soft spots, moisture, damaged plywood, and any framing issues, and hand you the findings with the leveling scope priced. All debris leaves the same day the crew does.
What We Find Under Tile in the DMV — Local Insights
This region's housing stock is old enough and consistent enough that the assembly under a tile floor is usually predictable from the address and the build year. Here is what that looks like city by city.
DC rowhouse bathrooms: expect a mortar bed
Bathrooms in Washington DC rowhouses built before the 1970s are frequently mud-set — hex or square mosaic tile over a one-to-two-inch mortar bed on wire lath. A 60 square foot floor in that assembly can yield well over 1,000 pounds of debris, all of which goes down a narrow staircase and out a front door onto a public sidewalk. That logistics reality, not the demolition itself, is what sets the price. Removing the bed also exposes the joists, which is the right moment to address any framing repair.
Flooring repair →Montgomery County split-levels and 1980s renovations
Kitchens and entries in Bethesda, Rockville, Silver Spring, and Gaithersburg often have tile installed over an added plywood underlayment rather than backer board — sometimes directly over the original hardwood. Removal in those homes can uncover oak worth refinishing rather than replacing, which changes the whole budget. We check before we demolish, not after.
Hardwood refinishing →Condo towers: the building rules set the schedule
High-rises along Rockville Pike and Wisconsin Avenue, in Arlington's Rosslyn–Ballston corridor, and around Tysons almost universally require a certificate of insurance on file, a reserved service elevator, protected corridors, and demolition confined to weekday business hours. Some restrict jackhammering outright. We file the paperwork in advance and plan the debris route before the crew arrives — this derails more condo flooring projects than anything technical.
Flooring in Arlington →Pre-1980 homes: stop before you scrape
Older homes in Takoma Park, inner Silver Spring, Capitol Hill, and older Alexandria neighborhoods can hide 9x9 vinyl-asbestos tile or black cutback adhesive beneath a later tile floor. Breaking the tile above it is not the hazard; grinding into the layer underneath is. We stop, leave it undisturbed, and tell you so a licensed inspector can test it before anyone continues.
Basements and below-grade slabs
Much of this region sits on clay soil that holds water against foundation walls, and below-grade slabs in Chevy Chase, Falls Church, and Potomac read high on a moisture meter far more often than owners expect. Once the tile and thinset are off, we take readings before recommending a replacement — which is why most basements here should get waterproof flooring rather than anything organic.
Estate homes with imported stone worth protecting
In McLean, Potomac, and Annapolis, the right answer is often not removal at all. Marble and travertine that looks worn or uneven can usually be ground, honed, and re-polished in place for far less than replacement — and matching a discontinued imported slab is rarely possible anyway. We will tell you when that is the better call.
Lippage removal & grinding →The Number That Surprises Homeowners: Weight
A standard tile assembly weighs roughly 7 to 8 pounds per square foot once you count the tile, thinset, and backer board. Add a traditional mortar bed and it climbs past 20 — a 1¼ inch bed alone is about 15 pounds per square foot. A 300 square foot mud-set kitchen is therefore not "a day of demolition"; it is three tons of material that has to be carried out of the building by hand.
That is why tile removal is priced differently from every other tear-out, and why a standard construction dumpster is the wrong container — most are rated well below what a tile job produces, and going over the limit generates overage charges that exceed the rental. Our pricing includes cutting, bagging, carrying, transport, and the tipping fee at a licensed transfer station, so the debris leaves the property the same day the crew does.
Tile Is Out — What Should Go Back Down?
The substrate report we hand you after removal exists to make this decision simple. Here is how most of our DMV clients choose.
New tile or stone, done properly this time
With the substrate already ground flat, this is the moment to install large-format porcelain or natural stone the way it should be done — correct flatness, correct offset, correct membrane.
Found hardwood underneath
It happens more than you would think in Montgomery County and Arlington homes where tile went over the original oak. If the boards survived the thinset, refinishing is usually cheaper than any new floor.
Hardwood refinishing →Kitchen, entry, or busy household
Luxury vinyl plank is the most requested replacement after tile removal — waterproof, warmer and quieter underfoot than tile, and far more forgiving of a substrate that took some damage coming up.
Bathroom or wet area
Removal exposes the waterproofing — or the absence of it. Rebuilding with a proper membrane system is the difference between a bathroom that lasts twenty years and one that fails in five.
Basement slab reading high on moisture
Do not put anything organic back over a slab that fails a moisture reading. Waterproof rigid-core over the right underlayment is the standard we recommend for below-grade rooms in this region.
Commercial space on a deadline
Lobbies, restrooms, retail, and restaurant floors are phased so the business keeps operating. Removal, prep, and installation run back to back over nights or a single weekend.
Removal Is Not Always the Answer
If the tile is sound but uneven, grinding costs a fraction of a tear-out and finishes in a day or two. Proud edges on porcelain, marble, travertine, and terrazzo can be levelled and the surface honed back to a matching sheen — see tile lippage removal.
If the problem is a handful of cracked or hollow tiles, individual replacement and re-grouting is straightforward and preserves the rest of the floor. Our flooring repair service covers that, and terrazzo restoration handles poured and pre-cast terrazzo that looks past saving but rarely is.
If the floor is dull rather than damaged, natural stone and terrazzo can be honed and re-polished in place. Commercial floors go through our commercial floor restoration service.
If the tile is water damaged or the subfloor is wet, that is time-sensitive and takes priority over any aesthetic decision — we offer emergency floor repair and water damage response throughout Maryland.
Tile & Stone Removal FAQs
How much does tile removal cost in Maryland, DC, and Northern Virginia?
Most residential floor tile removal in our service area runs $2.50 to $5 per square foot when the tile sits over backer board, and $3 to $6 when it is bonded to a concrete slab and the cured thinset has to be ground off. Traditional mud-set tile over a mortar bed runs $5 to $9 per square foot because of the weight. A typical 100 square foot bathroom lands between $500 and $900, and a 400 square foot kitchen and entry between $1,200 and $2,400. Every figure is a pre-inspection estimate — the price is confirmed only after we see what is under the tile.
Why is tile removal more expensive than removing carpet or vinyl?
Because you are removing four layers, not one. Tile, thinset, backer board, and a second mortar bed all have to come out before a new floor can go down, and each is bonded to the one below it. Tile also generates far more weight — roughly 7 to 8 pounds per square foot for a standard assembly, and up to 20 pounds per square foot for mud-set work. Disposal alone often exceeds what an entire carpet tear-out costs, because tile and mortar blow past the weight limit on a standard dumpster.
Does the thinset have to be removed too?
Yes, in nearly every case. Leftover thinset ridges leave the substrate far outside the flatness tolerance any new floor requires — the TCNA calls for 1/8 inch in 10 feet for large-format tile, and luxury vinyl plank telegraphs even small ridges through the surface. Grinding the slab or stripping the backer board is a real line item, and a tear-out quote that does not mention it is a quote you will pay twice.
Will removing the tile damage my subfloor?
On plywood, almost always to some degree — backer board is thinset-bonded and screwed down, and pulling it typically takes the top veneer ply with it. That is normal and it is why we price new underlayment as part of the substrate scope rather than pretending it will not be needed. On a concrete slab there is no damage to speak of, just cured thinset to grind and the occasional gouge to patch.
My house was built before 1980. Is asbestos a concern?
It is worth checking before anyone starts breaking things. Plenty of pre-1980 homes in Silver Spring, Takoma Park, Capitol Hill, and older Arlington neighborhoods have 9x9 vinyl-asbestos tile or black cutback adhesive sitting beneath a later tile floor, and some older mastics and mortars are also suspect. Our policy is to stop when we find suspect material, leave it undisturbed, and tell you so a licensed inspector can test it. In many cases the safest and least expensive outcome is to leave it sealed in place and float a new floor over the top.
How dusty is tile removal, and can you control it?
Uncontrolled tile demolition is the dustiest work in residential construction, and the dust carries respirable crystalline silica. We control it with zip-wall containment, a HEPA air scrubber running the room under negative pressure, wet methods and HEPA extraction at the tool, and protected egress from the work zone to the truck. It is what the OSHA silica standard requires and it is also what every condo and office building in the DMV asks to see documented before approving the work.
How long does tile removal take?
A single bathroom floor is typically half a day to a full day. A kitchen and entry runs one to two days. A whole main level with thinset grinding is two to four. Mud-set mortar beds roughly double those figures because the debris weight, not the demolition, sets the pace — the crew spends most of its time carrying material out. When removal and new installation are booked together we usually demolish and prep on the first day and start installing on the second.
Can you save my marble threshold or reuse the tile?
Thresholds and stone saddles are often salvageable and we set them aside on request. Field tile is a different matter — it is thinset-bonded and breaks during removal, so expect a low single-digit survival rate at best. If you need matching tile for a repair elsewhere, tell us before demolition starts and we will work a small area by hand to recover what we can.
Do I need a dumpster, and where does it go?
For most residential jobs we haul debris away in our own truck and pay the tipping fee at a licensed transfer station, which avoids the dumpster question entirely. Larger scopes do need one, and it has to be a heavy-debris container rather than a standard construction dumpster because tile and mortar exceed the usual weight allowance. Placing it on the street rather than a driveway generally requires a public-space or right-of-way permit from the local jurisdiction, and in DC rowhouse blocks with no alley access that is often the only option — so we arrange it in advance rather than on the morning of demolition.
What should go back down after the tile is out?
It depends on what the substrate turned out to be and which room it is. Wet areas usually go back to tile or a waterproof rigid-core floor. Basements and below-grade rooms almost always call for waterproof flooring rather than anything organic. Main-level living space is the most open decision — new tile, luxury vinyl plank, hardwood, or laminate all work over a properly prepped substrate. The substrate report we hand you after removal is written specifically to make that call straightforward.
Summer Demolition With Dust and Debris Kept Under Control
Tile removal is the dustiest phase of any DMV renovation, and summer allows for open windows, negative-air containment, and quick debris runs to the truck. It is also the season when investors and landlords turn over units between leases and need old tile out fast. Removing it properly protects the subfloor beneath so the replacement floor can go straight down.
Tile & Stone Removal — Service Areas
We provide tile & stone removal services throughout the DMV region.
Maryland
Washington, DC
- Tile & Stone Removal Washington DC
- Tile & Stone Removal Georgetown
- Tile & Stone Removal Capitol Hill
Find Out What's Under Your Tile
Book a free on-site inspection anywhere in Maryland, Washington DC, or Northern Virginia. We lift a tile, identify the assembly, and put the removal and substrate prep price in writing before any demolition begins.
Serving 17 cities across the DMV from our North Bethesda showroom · (301) 881-1115
2020 Flooring Showroom
2020 Flooring
5550-F Nicholson Lane, North Bethesda, MD 20852
Mon–Wed 10–7 · Thu–Sat 10–6 · Sun 11–5
Can't Come in Person?
We'll bring the showroom to you! Request a free in-home consultation and browse samples in the comfort of your own home.
Request Free In-Home ConsultTrusted by the DMV Community
For over 25 years, residential and commercial members of the DC, Maryland, and Virginia community have trusted 2020 Flooring. Check out what our customers have to say!
5.0on Google“We had a last minute major issue in the flooring we selected from another flooring installer on our kitchen renovation and addition. We had initially loved another flooring choice that we saw at 2020 Flooring. Unfortunately we found out it had been discontinued. Carol from 2020 Flooring went above and beyond to help us locate the amount of LVP flooring we needed by scouring the country. She found just the right amount and was able to get the order expedited so we could continue on the time schedule with our general contractor. Bobby from 2020 Flooring was great in helping us remedy an issue with the subfloor. We now have the exact flooring we wanted which has made our new kitchen and addition complete. Can't thank them enough!”
“As an architect, from the moment we walked into 2020 Flooring, upon seeing a standout recommendation on NextDoor, I was immediately impressed with Bobby and Carol's technical expertise, friendliness and professionalism. They asked the right questions, took their time to weigh flooring options for us without pressure and worked hard to meet our budget for new floors for our townhome. They committed to a date for installation and made it work. Their crew, led by Mariano, was highly competent, discrete, meticulous and worked long hours to complete the job in time. They stand by their work proudly and their warranty is better than anyone else's. Our new floors are fabulous and we wholeheartedly recommend 2020 Flooring!”
“I spent many hours trying to select a quality vinyl floor with the right color combination for my house and Carol at IDESIGN made the job easy with a great selection that I am very satisfied with. In general IDESIGN carries a good selection of quality floors but the added value of Carol's design expertise made the difference and I greatly benefited from her help. Thanks Carol😊”
Reviews sourced from Google. 2020 Flooring was given permission to publish reviews on this site.
Explore Our Flooring Services
Free In-Home Estimate
Our experts come to you with samples, measurements, and a detailed quote at no cost.
Schedule Estimate