MD · DC · VA(301) 881-1115
Hardwood floor refinishing service by 2020 Flooring restoring natural wood beauty
Google ReviewsFacebook ReviewsYelp Reviews

Hardwood Floor Removal in Washington DC, Maryland & Northern Virginia

Licensed, insured hardwood floor removal and haul-away across Washington DC, Maryland, and Northern Virginia — nail-down, glue-down, parquet, and floating floors.

Old wood out, every fastener pulled, adhesive ground off, subfloor left flat and moisture-tested, debris gone the same day. And before any of that, an honest answer about whether the floor needs to come out at all.

  • Free on-site assessment
  • Dust containment on every job
  • Subfloor left flat and tested
  • Debris hauled the same day

Serving 17 cities across the DMV from our North Bethesda showroom · Mon–Sat

Start here

The first question we answer: does it actually have to come out?

We remove solid and engineered hardwood, parquet, and floating wood floors and leave a clean, flat, inspection-ready subfloor. Every job starts with an honest assessment of whether the floor needs to come out at all, then runs under dust containment with HEPA extraction: boards and fasteners out, adhesive residue ground off, subfloor patched and moisture-tested, and every scrap hauled away the same day. We work in DC rowhouses, Montgomery County colonials, Northern Virginia townhomes, and high-rise condos with freight-elevator and certificate-of-insurance requirements.

A demolition crew has one answer to every floor. We are a flooring company, which means refinishing what you already have is a job we are just as happy to sell you — and across older Montgomery County, Arlington and DC homes, it is frequently the better one. A 3/4" solid oak floor can take several full sandings across its life. Original strip oak from the 1920s through the 1950s cannot be bought back once it is in a trailer.

Keep it and refinish

  • It is 3/4" solid oak, maple or hickory and has never been sanded flat to the tongue.
  • The problem is the finish, not the wood — worn traffic lanes, pet scratches, a dated stain colour.
  • Boards are tight and level underfoot with no soft or hollow spots.
  • You want a different colour. Colour is a refinishing decision, not a replacement decision.
  • It is original 1920s to 1950s strip oak. Once it is gone, it cannot be bought back.
See hardwood refinishing →

Remove it

  • Engineered wood whose veneer is already sanded thin, or under 2mm to begin with.
  • Boards cupped, crowned or buckled by a moisture source that has to be fixed underneath.
  • Pet urine or flood water that soaked through to the subfloor and still smells.
  • Glue-down engineered on a slab that is releasing, hollow-sounding or lifting at the seams.
  • You are changing material — tile in a kitchen, waterproof plank in a basement, an even threshold across an open-concept main level.
Get a removal price in writing →
Hardwood floor repair by 2020 Flooring with replacement boards woven into an existing oak floor
Board replacement woven into an existing oak floor. Where damage is local — a leak under a dishwasher, a pet-stained patch, a few split boards at a threshold — a repair costs a fraction of a full removal and the floor still matches.

The middle option most people miss

Removal is not the only alternative to living with a bad floor. We weave in replacement boards, re-secure loose planks, silence squeaks, rebuild water-damaged sections and re-sand the room so the repair disappears. On a floor that is otherwise sound, that is often a one-day job rather than a one-week project.

Cupped or buckled boards are the one case where we look harder before recommending anything, because the wood is a symptom rather than the problem. Read why hardwood floors cup in Maryland, Virginia and DC for what we look for, and what to do with old wood floors in Montgomery County if your home is pre-1960.

Scope

How the floor is attached decides the price — not the wood

Two identical-looking oak floors can differ by three dollars a square foot to remove, because one is nailed to plywood and the other is glued to a concrete slab. This is what we are checking when we lift a board at the assessment, and it is why nobody should quote this job from a photo.

Nail-Down & Staple-Down Solid Strip

The default in pre-1970 DC rowhouses, Silver Spring and Takoma Park bungalows, and Montgomery County colonials.

We score the field into manageable runs with the saw depth set to the board thickness so the blade never reaches the subfloor, lift with flooring bars, then pull every cleat and staple by hand. The fasteners are the slow part, not the wood — a single room can hold well over a thousand of them.

Watch for: 1x6 diagonal pine board subfloor underneath. It splits easily, and where it does the fix is board replacement or a plywood overlay, which changes your finished floor height at every doorway.

Glue-Down Engineered on Concrete

Standard in Bethesda, Rosslyn, Ballston, Tysons, NoMa and Navy Yard condos, and in finished basements across the region.

The wood comes up in pieces; the adhesive is the job. We run a walk-behind or ride-on scraper where access allows, then take the residue down with dust-shrouded grinders on HEPA extraction until the slab is clean enough for the next floor to bond or float over it.

Watch for: post-tension slabs in high-rise buildings. Nothing gets drilled or anchored into them — removal stays a surface operation, and any leveling is done with patch, not fasteners. This one has a section of its own further down.

Parquet Set in Mastic

Common in 1950s to 1970s ramblers and split-levels in Wheaton, Annandale, Bowie and College Park, often in a foyer or family room.

Parquet tiles pop off in fragments and leave a black or brown mastic skim behind. That residue has to come off before anything new is set, and it is the reason parquet removal prices above strip flooring per square foot.

Watch for: black cutback adhesive in a home built before 1980. We stop and test rather than grind it. See the pre-1978 section below.

Floating Engineered & Wood-Look Laminate

Everywhere in 1990s and later townhomes — Gaithersburg, Germantown, Centreville, Burke, Ashburn.

The cheapest removal there is. Nothing is fastened to the subfloor, so the planks unclick, the underlayment rolls up, and the transitions and shoe molding come off in the same pass.

Watch for: the reason it is being removed. Floating floors usually fail from a moisture source or a subfloor that was never flat — replace the floor without fixing that and the new one fails the same way.

Stair Treads, Risers & Landings

Priced per tread everywhere, because stairs are hand work from the first step to the last.

Retrofit treads, risers, nosings, landings and pie-shaped winders each come off individually. While the stairs are bare we check every stringer and tread for splits, squeaks and loose blocking and tell you what needs repair before anything new goes on.

Watch for: stairs that were carpeted first and boarded later. There is often a second surface, plus a few hundred staples, under the wood.

Wood Over Wood, and Other Surprises

Older DC and inner-suburb homes have been re-floored more than once.

We find engineered laid straight over original oak, laminate over parquet, and 9x9 vinyl tile sandwiched between layers. Each layer is its own removal, and we would rather find them during the free assessment than on the invoice.

Watch for: the original strip oak underneath. It is frequently in good enough shape to refinish, which turns a removal quote into a cheaper and better outcome.

Not sure which one you have?

We will tell you in about twenty minutes, on site, for free — and put the removal price in writing the same visit.

The hard one

Glued-down wood floor removal

A floor that was glued down at installation is the single most common reason we hear that a renovation stalled. Somebody looked at it, quoted a frightening number or declined the job outright, and the plan quietly died there. It should not. Glued-down wood comes up — the question is only which of two situations you have under your feet, because they are different jobs at different prices.

This is also the removal we run most often in this region. Almost every high-rise and mid-rise condo from Bethesda and Silver Spring through Rosslyn, Ballston, Tysons, NoMa and Navy Yard sits on a concrete slab, and so does every finished basement and split-foyer lower level in the Maryland and Virginia suburbs. Wood on concrete is nearly always glued.

Scenario A

Wood bonded straight to the concrete

The common one — most DMV condos, and most finished basements.

A ride-on scraper does the heavy lifting. The blade is thicker, wider and sharper than anything used on a nailed floor, and set at a shallow angle it drives under the boards and lifts the planks together with the bulk of the adhesive in a single pass rather than leaving a field of glue behind.

What the machine cannot reach — closets, under toe-kicks, the last few inches at every wall — comes up with angled hand tools on dust shrouds. The skim of adhesive left behind is then ground off with HEPA-extracted grinders until the slab is genuinely bond-ready.

Scenario B

Wood glued to plywood, plywood glued to the slab

The expensive surprise — common where a builder or a previous contractor wanted a nailable surface over concrete.

Two bonded layers, and a scraper blade cannot get under the bottom one. Instead we cut the field into manageable sections through both layers, with the saw depth controlled so the blade stops at the slab, then lever each section out as a unit and break it down for disposal.

It is slower, it produces far more debris volume, and it prices well above a single-layer removal — which is exactly why we want to find it during the free assessment rather than on day two. Adhesive left on the slab by the plywood is ground off the same way.

What a glue-down removal includes

  • Free in-home assessment, with the attachment method confirmed before a price is written
  • Aluminium ramps so machines cross thresholds and steps without damage
  • Plastic sheeting taped off, HVAC returns sealed, negative air with HEPA filtration
  • Baseboard and shoe molding removed beside the work area, then reset or replaced
  • Planks and adhesive lifted together wherever the slab allows it
  • Residual adhesive ground back to a bond-ready surface, not skimmed over
  • Hand work at closets, toe-kicks, thresholds and every perimeter edge
  • Debris loaded into our own enclosed trailers and gone the same day
  • HEPA vacuum and air scrubbing before we hand the space back
Engineered hardwood flooring installation by 2020 Flooring in a residential interior
Engineered hardwood installed over a properly cleaned slab. How flat and how clean we leave the concrete decides whether this floor lies quiet for twenty years or telegraphs every ridge of old adhesive underneath it.

Why we grind the slab instead of skimming over it

Leaving a film of old adhesive on the concrete is the shortcut that causes the next failure. New adhesive bonds to the residue rather than to the slab, patching compound lifts off it in sheets, and a floating floor rocks over every hardened ridge until the locking joints fail. A cheaper removal quote very often means this step is not in it — worth asking before you compare two numbers.

In newer high-rise buildings the slab is post-tensioned, so nothing is ever drilled or anchored into it. Removal stays a surface operation from start to finish, and any flattening afterwards is done with patching compound.

Local knowledge

What we expect to find under a DMV floor, by era and neighbourhood

The Washington region was built in distinct waves, and each one put a different floor over a different subfloor. Knowing which wave your house belongs to is most of the estimate before we arrive — and it is why a contractor who works Rockville colonials and Ballston high-rises every week prices this more accurately than one who does not.

Typical hardwood flooring and subfloor construction by era across Washington DC, Maryland and Northern Virginia
EraWhereTypical floorTypically underneathWhat it means for removal
Pre-1940Capitol Hill, Petworth, Georgetown, Old Town Alexandria, Takoma Park2 1/4" solid oak strip, face- or blind-nailedDiagonal 1x6 pine board subfloor over joists; occasional knob-and-tube era patchingHighest chance the floor is worth saving, and the highest chance the subfloor needs an overlay if it is not.
1940s – 1960sArlington, Falls Church, Silver Spring, Chevy Chase, Bethesda, HyattsvilleSolid oak strip, later covered by carpet in many homesPlank or early plywood subfloor; parquet and 9x9 vinyl tile in kitchens and foyersAsbestos-era materials are a live possibility. Testing before demolition, not after.
1970s – 1980sRockville, Wheaton, Annandale, Bowie, Springfield, LaurelParquet in mastic, early glue-down engineered, some solid stripPlywood over joists, or slab-on-grade in split-foyer lower levelsAdhesive residue removal is usually the largest single line on the estimate.
1990s – 2000sGaithersburg, Germantown, Centreville, Burke, Potomac, McLeanNail-down or floating engineered, wide-plank prefinishedOSB or plywood; radiant heat in some higher-end Potomac and McLean buildsRadiant tubing under the floor changes the method completely. Tell us before day one.
2000s – todayBethesda Row, Rosslyn, Ballston, Tysons, NoMa, Navy Yard, Reston Town CenterGlue-down engineered on slab, sometimes over an acoustic matPost-tension concrete slab with a building-mandated sound ratingBuilding paperwork, elevator windows and acoustic requirements drive the schedule as much as the floor does.

Generalisations, not guarantees — houses get re-floored, additions get built, and we find layered surfaces regularly. The free assessment is what turns this table into your actual scope.

Four things that change a hardwood removal in this region

These are the items that turn a routine tear-out into a delayed, re-priced or shut-down job when nobody checked for them first. We check for all four before quoting.

01

Pre-1980 materials and pre-1978 paint

Black cutback adhesive under parquet and 9x9 vinyl tile hidden beneath a wood floor can contain asbestos in homes built before roughly 1980 — and much of DC, Arlington, Alexandria, Silver Spring and Takoma Park is older than that. We do not disturb suspect material. Work stops, we show you what we are looking at, and sampling goes to an accredited lab. Abatement, if it is needed, is performed by a licensed abatement contractor: Maryland regulates that work through the Department of the Environment, the District through DOEE, and Virginia through DPOR.

Separately, the EPA Renovation, Repair and Painting rule applies to work disturbing painted surfaces in housing built before 1978 — which is what happens when shoe molding and baseboard come off plaster walls in a rowhouse. We flag it at the assessment and scope the trim under lead-safe work practices rather than finding it on day one.

02

Condo and co-op building rules

In Bethesda, Rosslyn, Ballston, Tysons, Silver Spring, NoMa and Navy Yard buildings, the floor is the easy part. Management will typically want a certificate of insurance naming the association, a reserved freight elevator window, work confined to posted weekday hours, protection through common corridors and lobbies, and approval of the replacement assembly before anything is torn out.

Most buildings also set a minimum sound rating for hard-surface flooring above the first floor, which means the acoustic underlayment has to be specified — and often approved — as part of the job. We carry the paperwork, book the dock and the elevator, and move debris out through the loading dock rather than the trash room, which virtually every building prohibits for construction material.

03

Debris, dumpsters and permits

Wood flooring with adhesive on the back is construction debris, not curbside bulk pickup. County facilities such as Montgomery County's Shady Grove transfer station and Fairfax County's I-66 site accept it by weight under their own rules, and placing a dumpster on a street or alley in the District requires a DDOT public space permit.

On rowhouse and townhouse jobs we normally avoid the dumpster entirely: material is bundled, carried out along a protected path, and loaded into enclosed trailers the same day. No pile in the driveway, no permit to chase, no weekend trip to a transfer station for you. Disposal is inside the quoted price, never a surprise line at the end.

04

Humidity, crawl spaces and slabs

The DMV runs from 60 to 70 percent indoor humidity in an August week down to 20 or 30 percent in the middle of heating season. Wood moves with that swing, so a floor that cupped, crowned, gapped or buckled is reporting a moisture problem rather than a manufacturing one.

Unvented crawl spaces with no ground vapour barrier under older Arlington, Falls Church and Silver Spring homes, basement slabs poured without one, slow supply-line leaks and bathrooms with no exhaust fan are the four sources we find most often. We take readings before the replacement is ordered — pin or pinless on wood subfloors, in-situ relative humidity probes to ASTM F2170 on concrete — because laying a new floor over an unsolved moisture source buys you the same failure twice.

Our process

Seven steps, and you stay in your house for all of them

Hardwood removal is a dusty, loud, heavy job. Contained properly, it is also a job you can live around — one sealed work zone, a protected path to the door, and the rest of the house untouched.

  1. 01

    Free on-site assessment

    We lift a board in an inconspicuous spot and find out what we are actually dealing with: species and thickness, how it is fastened, what is underneath, how much sandable wood is left, and whether there is a moisture source behind the damage. You get a straight answer on whether removal is the right call before anyone quotes it.

  2. 02

    Written scope and a fixed price

    Square footage, stair count, adhesive condition, subfloor repairs, disposal volume and any building requirements are priced line by line and put in writing. We do not quote hardwood removal over the phone, and the number does not move after the crew arrives.

  3. 03

    Protection and containment

    Plastic sheeting taped off across every doorway, HVAC returns sealed, floor protection down the entire carry-out path including corridors and elevator lobbies, and aluminium ramps over thresholds and steps so machines come in and out without marking a thing. A negative-air machine with HEPA filtration runs in the work zone the whole time. Baseboard and shoe molding beside the work area come off before demolition starts and are reset or replaced afterwards. Your family lives in the rest of the house while we work in one part of it.

  4. 04

    Demolition, matched to the attachment

    Saw-and-pry for nail-down, scrapers for glue-down, hand tools and heat for mastic, and hand work on every stair and closet. Fasteners are pulled rather than hammered flat, because a proud cleat telegraphs straight through the next floor.

  5. 05

    Residue removal and subfloor prep

    Adhesive ground off, squeaks screwed down, damaged decking cut out and replaced, and the floor checked for flatness against the tolerance the next material requires — typically within 3/16" over a 10-foot span for nail-down, tighter for glue-down and floating.

  6. 06

    Moisture testing and a written subfloor report

    Wood subfloors get a pin or pinless moisture reading; concrete gets in-situ relative humidity probes to ASTM F2170 when a slab is involved. You receive the numbers and photos in writing. Nobody orders a replacement floor off a guess.

  7. 07

    Clean-out, haul-away and disposal

    Debris is carried out along the protected path and loaded into our own enclosed trailers the same day, the work zone is HEPA-vacuumed wall to wall, and air scrubbers keep running until the dust is out of the air rather than settling back onto everything overnight. No pile in your driveway, no dumpster on your street, no trip to a transfer station for you — the room is left clean, swept and ready for the next floor to go down.

How long it takes

  • One room: usually same day.
  • Main level, 800 to 1,200 sq ft of nail-down: one to two days.
  • Same area glued to a concrete slab: two to four days — the adhesive is slower than the wood.
  • Subfloor repair or plywood overlay: add about a day.
  • Condo with restricted hours: same labour, longer calendar. We schedule around the building.

When we are also installing the replacement, removal and installation are booked as one continuous project so your home is not sitting on a bare subfloor waiting for a second contractor's calendar to open up.

Custom hardwood staircase installation by 2020 Flooring with finished wood stair treads
Stairs are removed and rebuilt by hand, tread by tread. Ours come back as finished hardwood stairs and railings once the removal and any stringer repairs are done.

Transparent pricing

What hardwood floor removal costs in the DMV

We publish our ranges because the complaint we hear most about other contractors is a price that changes once the work has started. These are the figures we work from across Maryland, Washington DC and Northern Virginia. Where your job lands inside a range depends on how the floor is attached, stair count, subfloor condition, access and parking, building restrictions, and disposal volume.

Estimated hardwood floor removal pricing for Maryland, Washington DC and Northern Virginia
Scope of workEstimated price*What it covers
Nail-down or staple-down hardwood removal & haul-away$1.75 – $3.25per sq ftBoards, cleats and staples out, subfloor swept and inspected
Floating engineered or wood-look laminate removal$1.00 – $2.00per sq ftPlanks, underlayment, transitions and shoe molding
Glue-down engineered on concrete, including adhesive removal$3.00 – $5.50per sq ftScraped and ground back to a bondable slab
Parquet set in mastic, including residue grinding$3.50 – $6.00per sq ftVaries with adhesive age and how much skim is left behind
Stair treads and risers$30 – $60per treadLandings and winders quoted individually
Subfloor flattening, patching and screw-down$1.25 – $2.75per sq ftOnly where flatness or squeaks require it — never assumed
Plywood overlay or board replacement$3.50 – $6.50per sq ftFor split plank subfloors and water-damaged decking
Removal bundled with new flooring from 2020 FlooringReduced $0.50 – $1.50per sq ftOne mobilisation, one crew, one protection set-up — you keep the difference

* Every figure on this page is an estimate. Final pricing follows an on-site inspection. Square footage, fastening method, adhesive age and condition, stair and landing count, subfloor repairs, pet or water damage, pre-1980 materials, parking and access, condo elevator restrictions, and disposal volume all move the number. We do not quote hardwood removal over the phone, and we do not change the price after the work has started — the written estimate you sign is the price you pay. A minimum service charge applies to small single-room jobs.

What that looks like on a real job

One bedroom, nail-down oak

$450 – $750*

A 12′ x 15′ room in a Silver Spring colonial. Falls at or near our minimum service charge, because mobilisation and containment cost the same for one room as for three.

Main level + stairs

$2,400 – $4,200*

Roughly 900 sq ft of nail-down oak plus 13 stair treads in a Rockville or Arlington colonial, with a plywood overlay allowance for a split plank subfloor.

High-rise condo, glue-down

$4,200 – $7,000*

About 1,100 sq ft of engineered wood glued to a post-tension slab in Bethesda or Rosslyn, including adhesive grinding, certificate of insurance and a reserved freight elevator window.

Whole home, mixed floors

$6,000 – $10,500*

A 2,400 sq ft Potomac or McLean house with strip oak through the living areas, parquet in the foyer, and subfloor repairs where a dishwasher leak had been running quietly for years.

Removal costs less when we install too

One crew, one protection set-up, one schedule — and typically $0.50 to $1.50 per square foot off the removal. Plan the replacement material with our flooring waste calculator.

After the removal

What goes back down — and what we would put there

Removal is rarely the goal. These are the floors our DMV customers most often choose once the old wood is out and the subfloor is flat, dry and ready. Every one of these photographs is a floor we installed.

Mullican St. Andrews oak hardwood flooring in Gunstock installed by 2020 Flooring after an old floor was removed

New solid oak, site or prefinished

The like-for-like replacement in an older colonial or rowhouse. Sandable for decades, and it matches the era of the house it is going into.

Solid hardwood →
Mullican Belleme European white oak engineered flooring in Cheverny installed by 2020 Flooring over a prepared subfloor

Wide-plank engineered white oak

The right answer over concrete, over radiant heat, and anywhere the humidity swing is wide — which in this region is most below-grade and slab-on-grade rooms.

Engineered hardwood →
Lauzon European white oak herringbone flooring installed by 2020 Flooring in a DMV home

Herringbone and parquet, done properly

The most common upgrade after a tired 1960s parquet foyer comes out. Modern herringbone needs a flatter subfloor than strip flooring, which is exactly what the removal prep delivers.

Parquet installation →
Mullican solid hickory hardwood flooring in Natural installed by 2020 Flooring in a residential interior

Harder wood for hard-used houses

Hickory runs well above oak on the Janka scale. If the floor you are removing was destroyed by dogs, kids and a back door onto a muddy yard, this is the sensible replacement.

Shop hardwood →
Luxury vinyl plank kitchen flooring installation by 2020 Flooring

Waterproof plank where wood failed

If the floor came out because of a basement slab, a laundry leak or a below-grade room that was never a good candidate for wood, rigid-core plank ends the cycle.

Tile and stone bathroom flooring installation by 2020 Flooring

Tile and stone in wet rooms

Wood in a bathroom, mudroom or laundry is a standing appointment with a repair crew. Removal is the moment to change that, and the subfloor is already exposed for proper prep.

Tile & stone →

Still deciding? Compare the options in our guides to carpet versus hardwood, choosing a hardwood species and laminate versus luxury vinyl, or visit the showroom and stand on the samples.

Commercial, multifamily and rental turnovers

Offices, retail and restaurants. Glued-down wood and wood-look plank in a DC or Tysons tenant space comes out after hours and on weekends so the business keeps trading. We phase by suite or floor, coordinate loading dock and freight access with building management, and hand the space back swept and ready each morning. See commercial flooring for how we run those projects.

Multifamily and rental turnovers. A vacant unit is a unit not earning. Removal and replacement are booked back to back, with consistent specifications across a building so a portfolio looks and wears the same. Property managers weighing what to put back should read our guide to rental property flooring in the DMV.

Water damage and emergencies. Wood that has been standing in water from a burst supply line, a failed sump pump or a roof leak has to come up quickly — wet subfloors and trapped moisture do not improve with time. We offer emergency floor repair and water damage response across Maryland and coordinate with your drying contractor and insurer.

Why homeowners call a flooring company instead of a demo crew

Anyone can get a floor out of a house. What you are actually buying is the condition the subfloor is left in, the dust that does not end up in the rest of your home, and somebody who knows what belongs there next.

We tell you when not to remove it

A demolition crew is paid to tear out floors. We are a flooring company, so refinishing the original oak is a service we would happily sell you instead — and on older DMV homes, it often is the better job.

The subfloor is part of the scope

A clean tear-out that leaves a bouncy, unflat, or damp subfloor has moved your problem rather than solved it. Flatness, squeaks and moisture readings are in our scope, not the next contractor’s change order.

One crew, removal through installation

When we install the replacement, there is nobody to blame and nobody to coordinate. One protection set-up, one schedule, one warranty, and a removal price that drops because of it.

We handle the building, not just the floor

Certificates of insurance naming the association, freight elevator reservations, approved work hours, corridor protection, acoustic underlayment specs — condo paperwork across Bethesda, Arlington and DC is routine for us.

Dust containment as standard, not an upsell

Zip walls, sealed returns, HEPA extraction and air scrubbing are in the base price on every hardwood removal we run. Grinding adhesive without them coats an entire house.

A local showroom you can stand in

Our North Bethesda showroom is ten minutes from most of Montgomery County and across the Beltway from DC and Northern Virginia. Bring a photo of the floor coming out and we will tell you what can go back down.

Hardwood Floor Removal FAQs

How much does hardwood floor removal cost in the DMV?

Most residential hardwood removal in Maryland, Washington DC and Northern Virginia falls between $1.75 and $3.25 per square foot for nail-down flooring, and between $3.00 and $5.50 per square foot for glue-down engineered wood on concrete, where the adhesive has to be ground off as well. Parquet set in mastic runs $3.50 to $6.00. Stairs are priced per tread at $30 to $60. These are pre-inspection estimates: square footage, stair count, adhesive condition, subfloor repairs, access, elevator restrictions and disposal volume all move the final figure, which is why we price from an on-site assessment rather than over the phone.

Should I remove my hardwood floors or refinish them?

If the floor is 3/4" solid hardwood and the boards are tight and level, refinishing is almost always cheaper and better than replacement — a solid floor can typically be sanded several times across its life, and colour is a refinishing decision rather than a replacement one. Remove it when the wood itself has failed: engineered flooring with a thin or already-sanded veneer, boards cupped or buckled by a moisture problem, pet urine or flood damage that reached the subfloor, failing glue-down on a slab, or a change of material. We give you that answer at the free assessment before quoting anything.

How long does hardwood floor removal take?

A single room is usually a same-day job. A typical main level of 800 to 1,200 square feet of nail-down flooring takes one to two days. Glue-down engineered wood on a concrete slab takes two to four days for the same area because adhesive removal and grinding is slower than the wood itself, and subfloor repairs or a plywood overlay add roughly a day. Condo buildings that restrict work to weekday business hours stretch the calendar without adding labour hours.

Do you remove glued-down hardwood from a concrete slab?

Yes, and it is one of the most common jobs we run in DMV condos and finished basements. The wood is removed first, then the adhesive is scraped and ground back with dust-shrouded equipment on HEPA extraction until the slab will accept the next floor. On post-tension slabs, which are standard in newer high-rise buildings, nothing is drilled or anchored into the concrete — removal stays a surface operation and any leveling is done with patching compound.

My wood is glued to plywood that is glued to the concrete. Is that different?

Yes, and it is the most expensive version of a glue-down removal. A scraper blade can get under wood bonded directly to a slab and lift the planks and most of the adhesive in one motion, but it cannot get under a second bonded layer. Instead we cut the field into manageable sections through both the wood and the plywood, with the saw depth controlled so the blade stops at the slab, then lever each section out as a unit. It takes longer, produces far more debris volume, and prices well above a single-layer removal — which is why we confirm which of the two you have during the free assessment rather than discovering it on day two.

Do you remove the baseboards and shoe molding?

Yes. Trim next to the work area comes off before demolition starts, and it is reset or replaced afterwards. Taking it off first protects it, gives us clean access to the perimeter where the last few inches of flooring and adhesive sit, and means the new floor can run properly to the wall instead of being scribed around old shoe molding. In homes built before 1978 we scope that trim removal under lead-safe work practices, since pulling painted molding off plaster disturbs paint.

Will the concrete be ready for a new floor, or is more prep needed?

Our scope is a bond-ready slab: planks off, adhesive ground back rather than skimmed over, perimeter and closets hand-worked, and the surface HEPA-vacuumed. Whether anything further is needed depends on the slab itself. Older concrete is frequently out of tolerance for a glue-down or floating floor and needs patching compound or a self-levelling underlayment, and slabs that read high on an in-situ relative humidity probe may need a moisture mitigation coating before wood goes back. We test and tell you before the replacement is ordered, not after it arrives.

What about asbestos under an old wood floor?

In homes built before roughly 1980, the black cutback adhesive under parquet and the 9x9 vinyl tile sometimes hidden beneath a wood floor can contain asbestos. We do not disturb suspect material. Work stops, we show you what we are looking at, and sampling goes to an accredited lab. If it tests positive, abatement is performed by a licensed asbestos abatement contractor — Maryland licenses that work through the Department of the Environment, the District through DOEE, and Virginia through DPOR — and we resume once the area is cleared. Finding it during the free assessment is far cheaper than finding it mid-demolition.

My home was built before 1978. Does that change anything?

It can. The EPA Renovation, Repair and Painting rule covers work that disturbs painted surfaces in housing built before 1978, and pulling shoe molding and baseboard off plaster walls in a Capitol Hill rowhouse or a 1940s Arlington cape does exactly that. We flag it at the assessment and scope the trim under lead-safe work practices — containment, wet methods, HEPA cleanup — rather than discovering it on day one.

Can you remove flooring in a condo building with an elevator and HOA rules?

Yes. We provide a certificate of insurance naming the association or management company, reserve the freight elevator for the window the building allows, protect corridors and lobbies along the carry-out route, and work within posted hours. Debris leaves through the loading dock in our trailers rather than through trash rooms and chutes, which nearly every building prohibits for construction material. Most buildings above the first floor also require a minimum sound rating for a replacement hard-surface floor, and we spec the acoustic underlayment to match.

Who disposes of the old flooring?

We do, and it is included in the price. Wood flooring with adhesive attached is construction debris, not curbside bulk trash — county facilities such as Montgomery County’s Shady Grove transfer station and Fairfax County’s I-66 site take it by weight and under their own rules, and a dumpster parked on a street or alley in the District needs a DDOT public space permit. On most rowhouse and townhouse jobs we skip the dumpster entirely and haul everything out in enclosed trailers the same day.

What condition will the subfloor be in when you finish?

Clean, swept, fastener-free and vacuumed, with squeaks screwed down and damaged decking cut out and replaced. We check flatness against what the next floor requires — around 3/16" over a 10-foot span for nail-down, tighter for glue-down and floating systems — and you get moisture readings in writing: pin or pinless on wood, in-situ relative humidity probes to ASTM F2170 on concrete. That report is what the replacement floor gets ordered against.

Why did my hardwood floor cup or buckle in the first place?

Almost always moisture, and almost always from below. The DMV swings from 60 to 70 percent indoor humidity in an August week to 20 or 30 percent in the middle of heating season, and wood moves with it. An unvented crawl space with no ground vapour barrier in an older Arlington or Falls Church home, a basement slab without one under it, a slow supply-line leak, or a bathroom that has never had an exhaust fan will all do it. Removing the floor without finding the source guarantees the replacement fails the same way, so we look for it before we quote.

Can I just remove the hardwood floor myself?

A single room of nail-down flooring over plywood, with no stairs and a way to legally dispose of the debris, is a genuine weekend project. Call a professional when the floor is glued to concrete, there is parquet in black mastic, the house predates 1980, there are stairs, there is water or pet damage, you live in a building with a management office, or there is original oak underneath that you would rather not destroy on the way out. In those cases DIY usually costs more once tool rental, dump fees and the repair bill for a gouged subfloor are counted.

Do you handle commercial and multifamily hardwood removal?

Yes. We run tenant turnovers, office and retail build-outs, restaurant refits and multifamily unit programmes across the DMV, with after-hours and weekend scheduling so a business does not lose trading days. Phased floor-by-floor work, loading dock coordination and building-mandated acoustic assemblies are all standard scope for us.

Fall in the DMV

Clear Out Worn Hardwood Before Holiday Traffic

Fall is the last comfortable window to remove a hardwood floor and have the replacement finished before Thanksgiving and December guests arrive. Worn traffic lanes, a failing parquet foyer, or pet-stained boards in a Silver Spring or Alexandria colonial all become more obvious once the house fills up. Removal and subfloor prep usually take one to three days, and the new floor follows within the same project window. Booking in September or October keeps you ahead of the holiday backlog.

Find out what your floor is hiding — free, and in writing

We lift a board, tell you whether it should come out or be refinished, and put the removal price in writing before any work begins. Anywhere in Washington DC, Maryland or Northern Virginia.

Serving 17 cities across the DMV from our North Bethesda showroom · (301) 881-1115

Visit Our Award-Winning Flooring Store

2020 Flooring Showroom

2020 Flooring

5550-F Nicholson Lane, North Bethesda, MD 20852

Mon–Wed 10–7 · Thu–Sat 10–6 · Sun 11–5

Get Directions

Can't Come in Person?

We'll bring the showroom to you! Request a free in-home consultation and browse samples in the comfort of your own home.

Request Free In-Home Consult
Proud Reputation

Trusted by the DMV Community

For over 25 years, residential and commercial members of the DC, Maryland, and Virginia community have trusted 2020 Flooring. Check out what our customers have to say!

5.0on Google

We had a last minute major issue in the flooring we selected from another flooring installer on our kitchen renovation and addition. We had initially loved another flooring choice that we saw at 2020 Flooring. Unfortunately we found out it had been discontinued. Carol from 2020 Flooring went above and beyond to help us locate the amount of LVP flooring we needed by scouring the country. She found just the right amount and was able to get the order expedited so we could continue on the time schedule with our general contractor. Bobby from 2020 Flooring was great in helping us remedy an issue with the subfloor. We now have the exact flooring we wanted which has made our new kitchen and addition complete. Can't thank them enough!

Amanda D

As an architect, from the moment we walked into 2020 Flooring, upon seeing a standout recommendation on NextDoor, I was immediately impressed with Bobby and Carol's technical expertise, friendliness and professionalism. They asked the right questions, took their time to weigh flooring options for us without pressure and worked hard to meet our budget for new floors for our townhome. They committed to a date for installation and made it work. Their crew, led by Mariano, was highly competent, discrete, meticulous and worked long hours to complete the job in time. They stand by their work proudly and their warranty is better than anyone else's. Our new floors are fabulous and we wholeheartedly recommend 2020 Flooring!

Marina K

I spent many hours trying to select a quality vinyl floor with the right color combination for my house and Carol at IDESIGN made the job easy with a great selection that I am very satisfied with. In general IDESIGN carries a good selection of quality floors but the added value of Carol's design expertise made the difference and I greatly benefited from her help. Thanks Carol😊

Liz C

Reviews sourced from Google. 2020 Flooring was given permission to publish reviews on this site.

CallTalk to a real expert, not AI.Free Quote